All the Drilling rigs and Non Destructive Digging Truck

October 11, 2016

Currently we have 5 rigs in operation & Vac truck (NDD).

  • Rig 1 – Geoprobe 6620DT
    • Dual tube sampling to 20m or refusal.
    • Auger/hollow auger (4.25″) to 50m with groundwater well installation
    • 20 -50mm pre packed screen installation through probe rods
    • 2.25″ – 3.5″ dual tube sampling
    • SPT & split spoon sampling
    • Shelby tube sampling

Geoprobe 6620DT

 

 

  • Rig 2 – Geoprobe 6620DT
    • Dual tube sampling to 20m or refusal.
    • Auger/hollow auger (4.25″) to 50m with groundwater well installation
    • 20-50mm pre packed screen installation through probe rods
    • 2.25″ – 3.5″ dual tube sampling
    • SPT & split spoon sampling
    • Shelby tube sampling

Geoprobe 6620DT

 

 

  • Rig 3 – Toro custom built rig
    • Dual tube sampling to 10m or refusal.
    • Auger/hollow auger (3″) to 10m with 50mm groundwater well installation
    • 20-25mm pre packed screen installation through probe rods
    • 2.25″  dual tube sampling
    • can work in confined space low ceiling areas.

Toro-custom-built-rig

 

 

  • Rig 4 – Geoprobe 7822DT
    • Dual tube sampling to 20m or refusal.
    • Auger/hollow auger (4.25″) to 50m with groundwater well installation
    • 6.25″ Hollow auger wells to 20m. Ability to install 100mm wells.
    • can install up to 250mm diameter scavenge wells to 10m.
    • 50mm pre packed screen installation through probe rods
    • 2.25″ – 3.5″ dual tube sampling
    • SPT & split spoon sampling
    • Shelby tube sampling

 

Geoprobe 7822DT

 

 

  • Rig 5 – Geoprobe 6625CPT
    • Dual tube sampling to 15m or refusal.
    • Auger/hollow auger (4.25″) up to 50m with groundwater well installation
    • 20-50mm pre packed screen installation through probe rods
    • 2.25″ – 3.5″ dual tube sampling
    • CPTu (Cone penetration testing)

 

Geoprobe 6625CPT

Vacuum Extraction/NDD (Non Destructive digging)

Vacuum Extraction/NDD (Non Destructive digging)

 

Other services we provide:

  • carry out soil vapour testing, install soil vapour wells/implants
  • concrete core/cut
  •  install vertical drains
  •  inject ORC
  • and have the ability to undertake special “one off” projects.

 

DPP ‘s drillers are highly trained (Min qualification Cert 3 in environmental/ drilling operations) and all jobs are supervised. All DPP operators hold a Safety Awareness Card or Blue Card indicating compliance with the mandatory safety training requirements for construction industry workers.

Our Safety, Health & Environmental Management System (SHEMS) is based on best practice standards and complies with Australian Standards AS 4801 and AS 14001.